Bukit Berapit – Synthetic Fiber Concrete Track Slab
BarChip Synthetic Fiber reinforced concrete track slab.
SEARCH THROUGH ALL OUR PROJECTS / BLOGS.
BarChip Synthetic Fiber reinforced concrete track slab.
The Caldecott Fourth Bore Project is a 1,030m long, 15.2m wide, US$420 million highway tunnel in the San Francisco Bay Area
In late 2010 a Burial Vault Manufacturer in The United States undertook a testing program to find a new, cost effective burial vault designs.
The Santoña – Laredo tunnel reduces precast segment costs by 40%.
Numerous standards and guidelines exist for design with macro synthetic fiber concrete reinforcement. Contact us for more information on any standards listed below or for assistance in developing new national standards.
Excavation speeds in the Mt Ovit Tunnel increased 25% after a switch to BarChip Macro Synthetic Fibers
Barchip Synthetic Fibers are the primary reinforcement in precast domes protecting Thailand’s coast from erosion
BarChip Fibers reinforced the Precast Tanks in this ambitious waste water treatment system
BarChip fibers were used to reinforce the Victor Harbor Boat Ramp in corrosive conditions