Amazon Fulfilment Centre Feb 20, 2024 | Concrete Flooring, FlooringBarChip MQ58 was used as the primary concrete reinforcement in Amazon’s 41,180 m2 fulfilment centre.
Warland St Fibre Shotcrete Culvert Slop Stabilisation Feb 7, 2024 | Civil, Sprayed Concrete ShotcreteBarChip fibre reinforced shotcrete was used for the walls of the Warland St Trunk Drain, recovering construction time lost to bad weather.
Cross River Rail Shotcrete Lining Feb 2, 2024 | Sprayed Concrete Shotcrete, TunnellingIn an Australian first, BarChip fibre was used as the primary reinforcement in the primary shotcrete lining of the commuter rail tunnels at Brisbane’s Cross River Rail.
BTS Specification for Tunnelling 4th Edition Dec 18, 2023 | News, TunnellingThe British Tunnelling Society has released the fourth edition of Specification in Tunnelling. You can download the fourth edition here.
BarChip Flooring Design Tables Nov 17, 2023 | Flooring, News, Testing and DesignBarChip’s flooring design tables allow you to quickly check required dose rate and thickness of concrete flooring and pavements.