![Taurus Armas Factory Floor](https://barchip.com/wp-content/uploads/2024/02/Taurus-Fibre-Concrete-Flooring-BarChip2.jpg)
Taurus Armas Factory Floor
The total expansion of 22,000 m2 allowed Taurus to increase production by 50% and included logistics and distribution facilities, engineering, laboratories and offices.
SEARCH THROUGH ALL OUR PROJECTS / BLOGS.
The total expansion of 22,000 m2 allowed Taurus to increase production by 50% and included logistics and distribution facilities, engineering, laboratories and offices.
BarChip MQ58 was used as the primary concrete reinforcement in Amazon’s 41,180 m2 fulfilment centre.
BarChip fibre reinforced shotcrete was used for the walls of the Warland St Trunk Drain, recovering construction time lost to bad weather.
In an Australian first, BarChip fibre was used as the primary reinforcement in the primary shotcrete lining of the commuter rail tunnels at Brisbane’s Cross River Rail.
The British Tunnelling Society has released the fourth edition of Specification in Tunnelling. You can download the fourth edition here.