Prestressed Precast Grandstand Elements | Debrecen Stadium
Prestressed precast grandstand elements at Debrecen Stadium used BarChip 48 to eliminate steel stirrups and reduce slab thickness by 45%.
Prestressed precast grandstand elements at Debrecen Stadium used BarChip 48 to eliminate steel stirrups and reduce slab thickness by 45%.
BarChip Synthetic Fiber reinforced concrete track slab.
The Caldecott Fourth Bore Tunnel demonstrates an innovative load-sharing tunnel lining system, which resulted in engineers reducing the final lining thickness by 30%.
Barchip are proud sponsors of the 2017 Australasian Tunnelling Conference, 30 Oct to 1 Nov, Sydney Australia. Visit us at booth 17 for a corrosion free future.
BarChip macro synthetic fibre was used in the permanent sprayed concrete tunnel lining at the North Strathfield Rail Underpass in Sydney.
Barchip will be exhibiting and presenting at AusRail2016.
Independent WJE testing demonstrated how BarChip macro synthetic fibres can be used to optimise reinforcement and validate the structural performance of fibre reinforced precast burial vaults.
BarChip macro synthetic fibre simplified precast segmental tunnel lining production for the Santoña-Laredo Water Tunnel in Spain, reducing production time by almost 50% and lowering segment costs by 40%.
Numerous standards and guidelines exist for design with macro synthetic fiber concrete reinforcement. Contact us for more information on any standards listed below or for assistance in developing new national standards.