BarChip Reinforced Brenner Base Tunnel
BarChip is reinforcing the shotcrete works on the Brenner Base Tunnel which will be the largest underground railway connection when complete.
BarChip is reinforcing the shotcrete works on the Brenner Base Tunnel which will be the largest underground railway connection when complete.
BarChip eliminates 432 tonnes of steel reinforcement from Hardstand, saving contractor over 50 days of work.
Two warehouses. Same design, same conditions, same service life. After 24 years, the only difference is the crack control performance of the reinforcement systems.
75 meter driveway retaining wall completed in just 3 days, saving home owners thousands.
BarChip reinforced Sydney Metro wins 2022 Australian Construction Achievement award.
BarChip fibre reinforced shotcrete is supporting the Alto Maipo Hydro Power, one of the largest infrastructure projects in Chile.
BarChip fibre reinforced shotcrete is supporting the Melón II road tunnel in Valparaíso, Chile.
BarChip is proud to be a Silver Sponsor of the 2021 RILEM-fib international symposium on Fibre Reinforced Concrete.
Barchip is a proud member of the Infrastructure Sustainability Council of Australia (ISCA). Low carbon concrete reinforcement.
BarChip fibre reinforced shotcrete helps deliver $1.8 million in savings and reduce lining thickness by 50% at Fish Creek Tunnel.
BarChip synthetic fibre concrete reinforcement eliminated 67% of the steel bar reinforcement from the port Chernomorets floating pontoons.
BarChip fibre helps eliminate corrosion risks from Artificial precast concrete reefs in Corsica.