HelloParks Jointless Floor with Macro Synthetic Fibre Concrete
BarChip MQ58 delivers a unique triple benefit for HelloParks Jointless Floor – residual strength, shrinkage control and fibre free surface finish. See the full details here.
SEARCH THROUGH ALL OUR PROJECTS / BLOGS.
BarChip MQ58 delivers a unique triple benefit for HelloParks Jointless Floor – residual strength, shrinkage control and fibre free surface finish. See the full details here.
11 Key Facts on the Creep of Fibre Reinforced Concrete: Your Ultimate Guide on Fibre Concrete Creep.
JOINTLESS Flooring Solutions with BarChip macro synthetic fibre. HelloParks 46,500 m2 PT2 Big Box warehouse is a prime example of fibre reinforced jointless flooring without steel reinforcement.
BarChip fibre was used to reinforce the Jackon THERMOMUR insulated concrete forms from BEWI at Villa Fonnes in Norway.
The total expansion of 22,000 m2 allowed Taurus to increase production by 50% and included logistics and distribution facilities, engineering, laboratories and offices.
BarChip MQ58 was used as the primary concrete reinforcement in Amazon’s 41,180 m2 fulfilment centre.
BarChip’s flooring design tables allow you to quickly check required dose rate and thickness of concrete flooring and pavements.
BarChip reduce carbon footprint of shotcrete ground support by over 70 million kg of carbon.
We are excited about the opportunities this facility brings, both in the global construction market and throughout Latin America.
BarChip fibre eliminates the need for steel mesh in the 4,500 m2 concrete screed overlay of Primark’s flagship Romanian store.
BarChip replaces trench mesh in housing slabs. In total Barchip replaced the entire trench mesh cage and 90% of all steel in the system. JKP Static Engineer Péter Schaul explains…
BarChip eliminates 432 tonnes of steel reinforcement from Hardstand, saving contractor over 50 days of work.