
World Record 2 km Fibre Reinforced Concrete Pour
BarChip FRC pumped a world record 2km for the Forrestfield-Aiport Link Track Slab and won the 2023 CIA state award for excellence…
SEARCH THROUGH ALL OUR PROJECTS / BLOGS.
BarChip FRC pumped a world record 2km for the Forrestfield-Aiport Link Track Slab and won the 2023 CIA state award for excellence…
BarChip replaces trench mesh in housing slabs. In total Barchip replaced the entire trench mesh cage and 90% of all steel in the system. JKP Static Engineer Péter Schaul explains…
After 15 years the BarChip fibre reinforced concrete trackslab of the Docklands Light Rail shows no signs of deterioration. Read more…
Once an unused and overgrown section of land between the sea and the highway, Reidi Tee Prominade has been transformed from a wasteland to one of the best public spaces in Tallinn.
BarChip eliminates steel mesh from precast moulds, helping Plastek Industries deliver high performance, low cast precast concrete solutions.
Full-scale testing of BarChip fibre reinforced tunnel segments proves that anyone who says you can’t use maco synthetic fibre in segments is wrong.
Full scale testing shows without a doubt that BarChip is a suitable material for use in precast concrete tunnel segments.
Anyone who says you can’t use macro synthetic fibre in a segmental tunnel lining is wrong and in this series of posts we’ll show you why.
Premix fibre reinforced supersacks utilised at the Courthouse Commons tunnel, an American Shotcrete Association project of the year.
BarChip fibre is reinforcing the shotcrete ground support at the Lyon-Turin Base Tunnel, one of the longest railway tunnels in the world.
BarChip is reinforcing the shotcrete works on the Brenner Base Tunnel which will be the largest underground railway connection when complete.
BarChip eliminates 432 tonnes of steel reinforcement from Hardstand, saving contractor over 50 days of work.