40% Reduction in Precast Tunnel Segment Cost
BarChip macro synthetic fibre simplified precast segmental tunnel lining production for the Santoña-Laredo Water Tunnel in Spain, reducing production time by almost 50% and lowering segment costs by 40%.
BarChip macro synthetic fibre simplified precast segmental tunnel lining production for the Santoña-Laredo Water Tunnel in Spain, reducing production time by almost 50% and lowering segment costs by 40%.
The precast tunnel segments of the Harefield to Southall tunnel were solely reinforced with Barchip’s synthetic fiber concrete reinforcement.