Fibre Reinforced Monolithic Slab - Morningstar Storage

Morningstar Storage Facility – Fibre Reinforced Monolithic Slab 

BarChip Reduced the Carbon Footprint of Reinforcement by 75%.

 

Fibre reinforced concrete flooring slab for storage facility.

 

Fibre Reinforcement: BarChip MQ58
Dosage Rate: 7 lbs/cy
Original Design: #5 rebar mat 12” center spacing
Total Yardage: 1,470 yds3
Mix Design: Mix Design: 4000 psi normal weight non air
Slab Thickness: 10 inches
Placement Method: Telebelt Truck

In September 2025, BarChip was used to replace traditional steel reinforcement in a large monolithic slab for a new Morningstar Storage Facility in Huntersville, North Carolina. The original design specified a #5 rebar mat at 12 inches on center, but the project was changed to a BarChip reinforced design using 7 lbs per cubic yard of MQ58. In total, approximately 10,000 lbs of BarChip replaced 37,000 lbs of steel reinforcement, reducing the embodied carbon of the reinforcement by approximately 75% and eliminated two days of steel placement by two eight man crews, reducing labor requirements and speeding up the schedule.

To meet production demands, two readymix plants supplied the project, with quality control managers from each plant and two BarChip technical representatives overseeing batching and fiber addition to ensure uniformity. Fibers were introduced at the wash rack after each truck was fully loaded. After all fibers were added, each truck was mixed on high speed to ensure full dispersion. Before leaving the plant, slump was confirmed at 6 inches, and air content remained consistent with the non air-entrained target of approximately 1.5%.

Image of telebelt truch being used at concrete pour

At the site, concrete was discharged onto two telebelt trucks to distribute material efficiently across the slab area. This setup supported continuous placement, reduced pour time, and helped prevent cold joints or delays in finishing operations. Once placed, the finishing crew began screeding and power troweling operations. The MQ58 fibers behaved as expected, working smoothly into the surface paste to produce a clean, fiber free finish.

Concrete finish with BarChip MQ58 macro synthetic fibre

The use of BarChip MQ58 at 7 lbs/yd³ effectively replaced the structural function of the specified #5 rebar mat. With proper batching controls, fiber introduction procedures and quality oversight, the project demonstrated that macro synthetic fiber reinforced concrete can deliver performance and finish quality equal to, or better than traditional steel reinforcement.

 

Concrete being placed for monolithic slab.

Power troweling finish of fibre reinforced concrete

 