Grandis Close Eliminates Steel Mesh From Townhouse Slabs
Grandis Close 19 townhouse development reinforced the engineered concrete slabs with Barchip syntehtic fibers.
Grandis Close 19 townhouse development reinforced the engineered concrete slabs with Barchip syntehtic fibers.
Cast in Situ final lining of the Legacy Way Cross Passages reinforced with Barchip Synthetic Fiber Concrete Reinforcement.
Barchip Synthetic Fiber Reinforcement used as the primary reinforcement in the Cast In Place Final Lining at the Euclid Creek Starter and Exit Tunnels.
The precast concrete segmental lining of the Harefield to Southall tunnel is solely reinforced with Barchip’s synthetic fiber concrete reinforcement.
Barchip Synthetic Fiber Reinforced Precast Segmental Lining used on the Malaga Rail Tunnel.