Thank you this document is available to download below
Further Tunneling Projects
BarChip Fibre Concrete Track Slab
In an Australian first, the Sydney metro concrete track slab replaces steel with corrosion free BarChip synthetic fibre. Find out more.
BarChip Fibre Reinforced Concrete Precast Tunnel Segments
In an American First, the Blacksnake Creek Tunnel incorporates 100% BarChip synthetic fibre reinforced concrete for the precast concrete tunnel segments.
Caldecott Fourth Bore Tunnel: An Innovative NATM Design
The Caldecott Fourth Bore Project is a 1,030m long, 15.2m wide, US$420 million highway tunnel in the San Francisco Bay Area
St Helena Tunnel- Byron Bay, Australia
St Helena Tunnel: Australia's First Synthetic Fiber Reinforced Road Tunnel The First Macro Synthetic Fibre Reinforced Road Tunnel in Australia - BarChip Fibre Reinforced Shotcrete Download the paper: Pacific Highway Updrade from Tintenbar to Ewingsdale...
Innovative Use of Fiber Reinforced Shotcrete
Innovative Use of Fiber Reinforced Shotcrete on the North Strathfield Rail Underpass- Sydney, NSW The first use of macro synthetic fibre reinforced ground support in a rail tunnel in Australia. Downloading the paper, "The North Strathfield Rail Underpass-...
40% Reduction in Precast Tunnel Segment Cost
The Santoña – Laredo tunnel reduces precast segment costs by 40%.
Development Speeds Increase 25% at Mt Ovit Tunnel, Turkey
Excavation speeds in the Mt Ovit Tunnel increased 25% after a switch to BarChip Macro Synthetic Fibers
Legacy Way Tunnel Cross Passages
Cast in Situ final lining of the Legacy Way Cross Passages reinforced with Barchip Synthetic Fiber Concrete Reinforcement.
Euclid Creek Starter and Exit Tunnels
Barchip Synthetic Fiber Reinforcement used as the primary reinforcement in the Cast In Place Final Lining at the Euclid Creek Starter and Exit Tunnels.